“As an architect with over 20 years of designing custom homes, the San Miguel project is the first to utilize SIP technology. In addition to designing the structure, I was actively involved in the installation of the panels, observing a framing crew that had never built a SIP structure. After some brief instruction by Phil Ligon of Premier SIPs, the floor, walls, and roof were assembled with little difficulty. Having a fully insulated structure for the remaining trades to work under, has been a big bonus during the Phoenix summer. Now that I have seen how SIPs work, I can’t imagine building future projects utilizing “old school” methods. I would recommend SIPs to anyone building new structures today.” – Eric L Meyerowitz
PROJECT OVERVIEW
BUILDING WITH SIPS
Building systems with acceleration advantages is key these days for builders and developers. With weather constrictions, labor shortages and positive building economy… construction teams are wanting to get projects up easy and quick. Erection of SIP panels is estimated to be as much as 3 times faster than traditional framing with no special training for framing installation needed, and provides multiple building needs all in one step. More benefits include:
PROJECT TEAM
Visit Eric L Meyerowitz Architect for more: Model photos, house demolition, foundation work timeline and installation photos
QUESTIONS ON THIS PROJECT?
Contact: Phil Ligon, Southwest Regional Manager
Email: phil.ligon@premiersips.com
Direct: 602.369.9247
Ask Phil to Connect With You on LinkedIn | Follow Premier SIPS on LinkedIn