Built Beyond Average:
Why Leading Builders & Developers Are Moving Beyond Conventional Framing

Free live webinar · Tue, Dec 8 · 11 AM PT / 12 MT / 1 CT · 60 min
The challenge today isn't just building faster. It's delivering higher-performing buildings with more predictability and fewer long-term problems. See how leading builders and developers are answering tighter codes, labor pressure, weather delays and higher financing costs with a SIPS building envelope.

55%

faster installation than stick framing (RSMeans Time and Motion Study)

130

labor hours saved on a 2,500 SF home (RSMeans)

30%

less wood framing waste on the jobsite

What You'll Learn

  • A simpler path to higher performance: why meeting today's codes with conventional framing keeps getting more complex, and how SIPS build structure, insulation, and air barrier into one assembly with fewer layers, trades, and failure points.
  • Faster dry-in, fewer callbacks: how factory precision and a shell closed in days cut weather exposure, wet-framing risk, and warranty calls like nail pops and drywall cracks.
  • What changes for your crew and trades: electrical chases, plumbing, smaller HVAC, and the training and onsite support Premier provides from design through install.
  • Live Q&A: bring your next project.

Who it's for: Residential and light-commercial builders, GCs, framers, and SIP installers curious about SIPS, or ready to quote their first SIPS job.

Proof: Grandfamilies Place, Phoenix

56 units, two 3-story buildings, 23,500 SF of SIPS walls framed in under a month. The developer now specifies SIPS on every multifamily project.

Presenters

Jim Christ

Jim Christ
Mountain Regional Sales Manager, Premier SIPS

Jessie Carwile

Jessie Carwile
Mountain & Eastern Regional Sales Manager, Premier SIPS

Can't make it live? Register anyway, and we'll send you the recording.

Have a project now? Tell us about your next project →

Save my seat