Built Beyond Average:
Why Leading Builders & Developers Are Moving Beyond Conventional Framing

Free live webinar · Wed, Nov 4 · 11 AM PT / 12 MT / 1 CT · 60 min
The challenge today isn't just building faster. It's delivering higher-performing buildings with more predictability and fewer long-term problems. See how leading builders and developers are answering tighter codes, labor pressure, weather delays and higher financing costs with a SIPS building envelope.

55%

faster installation than stick framing (RSMeans Time and Motion Study)

130

labor hours saved on a 2,500 SF home (RSMeans)

30%

less wood framing waste on the jobsite

What You'll Learn

  • A simpler path to higher performance: why meeting today's codes with conventional framing keeps getting more complex, and how SIPS build structure, insulation, and air barrier into one assembly with fewer layers, trades, and failure points.
  • Faster dry-in, fewer callbacks: how factory precision and a shell closed in days cut weather exposure, wet-framing risk, and warranty calls like nail pops and drywall cracks.
  • What changes for your crew and trades: electrical chases, plumbing, smaller HVAC, and the training and onsite support Premier provides from design through install.
  • Live Q&A: bring your next project.

Who it's for: Residential and light-commercial builders, GCs, framers, and SIP installers curious about SIPS, or ready to quote their first SIPS job.

Proof: Grandfamilies Place, Phoenix

56 units, two 3-story buildings, 23,500 SF of SIPS walls framed in under a month. The developer now specifies SIPS on every multifamily project.

Presenters

Jim Christ

Jim Christ
Mountain Regional Sales Manager, Premier SIPS

Phil Ligon

Phil Ligon
SW Regional Sales Manager, Premier SIPS

Can't make it live? Register anyway, and we'll send you the recording.

Have a project now? Tell us about your next project →

Save my seat