Premier SIPS Blog

Accelerating Construction, Reducing Budget Overruns with SIPs

Written by Premier SIPS | Aug 28, 2024 3:48:07 PM

 

In the construction industry, time truly is money. Project delays and budget overruns can wreak havoc on developers and contractors, leading to significant financial losses and stalled progress. Fortunately, Structural Insulated Panels (SIPs) are transforming construction practices, offering a predictable and efficient system that mitigates these common challenges.  Explore how SIPs can accelerate construction, reduce costs, and streamline project management, especially in a complex multi-trade environment.

The Hidden Costs of Construction Delays

Construction delays are more than just an inconvenience—they can lead to a cascade of financial setbacks. Here are some of the hidden costs of these delays:

  • Extended Loan Interest: Prolonged construction timelines increase the period during which interest accrues on construction loans, leading to higher overall costs.
  • Labor Costs: Delays often require extended labor hours, increasing payroll expenses and potentially leading to overtime pay.
  • Schedule Disruption: With labor challenges existing throughout North America, setting back one trade can significantly impact others. Many won't be able to reschedule accordingly, further delaying a project and/or paying higher costs to fit in key subs. 
  • Material Costs: Price fluctuations can result in higher costs for materials if purchases are delayed.
  • Equipment Rental Costs: Extended rental equipment costs.
  • Opportunity Costs: Delayed projects mean delayed revenue, affecting cash flow and potential investment in future projects.
  • Inflation and Interest Rates: Rising interest rates can further exacerbate costs, especially if projects are prolonged into periods of higher economic volatility.

Daily Cost Of Construction

In a 2023 study the Association of Professional Builders revealed that more than 48.3% of builders don’t know their fixed expenses per job per day. Which means they also don't know the cost of delays, which are important as they directly impact a project's bottom line.

The study further notes, "To put this into perspective, an average $750,000 build can cost a builder around $670 every day the job is delayed. One week of delay, which in theory doesn’t sound that bad, actually ends up costing builders thousands of dollars in cold hard cash."

SIPs: A Predictable and Efficient System

SIPs offer a streamlined construction method that significantly reduces the uncertainties and delays commonly associated with traditional building techniques. Here’s how  you can build with confidence with SIPs:

1. Precise Prefabrication for Swift Assembly

SIPs are prefabricated off-site according to exact specifications, eliminating the need for on-site adjustments. This precision reduces the likelihood of errors and rework, streamlining the construction process. The panels arrive ready to be installed, fitting together like pieces of a well-designed puzzle. 

2.  All-In-One Design

Each SIP combines structural integrity, sheathing, and insulation in a single unit. This holistic design eliminates multiple steps in the construction process, reducing the need for various trades and minimizing scheduling conflicts. With SIPs, framing, sheathing, and insulating are accomplished in one step, saving time and labor. 

3. Accelerated Dry-In Process - Buildings Complete In Days Not Weeks

Traditional site-framed construction is slow, and leaves buildings exposed to the elements, potentially causing weather-related delays. SIPs, however, are installed quickly, are exceptionally insulated and weather-resistant, allowing structures to be dried in faster. This rapid enclosure protects the building from adverse weather, enabling subsequent construction phases to continue without delays or additional cost overruns.

Project Highlight, Award Winning Residential:  “This was a very difficult site, with very little room to store materials on-site. The use of SIPS allowed us to bring in a very compact set of wall panels, install them, and then bring in the triangle-shaped roof panels, install the roof in just one day, including the roof beams. You would have been there for weeks trying to stick-frame this roof, and would not have even been able to meet the ventilation requirements for a vented roof system. Though not required in this location, the home also meets the requirements for the Wildland Urban Interface Code.”  - Homeowner

The Ripple Effect of Faster Construction

One common concern with faster construction is the potential compromise in quality. While it's true that some builders may cut corners to expedite a project, reputable builders prioritize both speed and quality. Using product systems such as SIPs ensures that efficiency does not come at the expense of craftsmanship. Here’s how SIPs maintain high standards while accelerating the construction process:

1. Enhanced Quality Control with Prefabrication

SIPs are manufactured in a controlled factory environment, with computerized equipment that cuts panels with precision accuracy, ensuring quality that cannot be delivered with site framed processes. This controlled setting allows for rigorous inspections and adherence to strict quality standards, reducing the risk of on-site errors and defects. The precise nature of SIP prefabrication minimizes the chance of human error during installation, ensuring a solid and stable construction.

2. Superior Structural Integrity

SIPs provide excellent structural strength, surpassing traditional framing methods. The panels are typically twice as strong as stick framed assemblies and the component assemblies are engineered to deliver robust and durable construction, capable of withstanding various environmental stresses. Each SIP integrates strong and flat engineered panels that incorporates the structure, solid core insulation, and sheathing into one unit, reducing the need for multiple construction phases and trades. This integration ensures that every panel meets the same high-quality standards, resulting in a more uniform and reliable building envelope.

3. Long-Term Performance

SIP-constructed buildings are known for their long-term performance and energy efficiency. The superior properties of solid insulation cores (vs fiberglass batt and other non-rigid insulation options) of SIPs contribute to lower energy costs and enhanced comfort for occupants, demonstrating that quality is not sacrificed for speed. 

4. The Chain Reaction For Other Trades 

The speed of SIP construction sets off a positive chain reaction throughout the entire project lifecycle:

  • Earlier Start for Other Trades: As SIP buildings are dried in quickly, other trades (e.g., electrical, plumbing) can begin their work sooner, leading to a more synchronized workflow.
  • Reduced Construction Loan Costs: Faster completion means lower interest expenses on construction loans.
  • Reduced Cash Reserves:  Due to the reduced risk of callback issues the cash reserve for callbacks can be reduced.  This frees up capital for other business opportunities that would have been otherwise unavailable.
  • Optimized Resource Allocation: Efficient use of labor and materials reduces waste and overall project costs.
  • Reduced Dumpster Costs/Rentals:  It is estimated that 1/3 the quantity of Dumpsters are required with SIP construction with approximately one dumpster required for every 1,500 square feet compared to one dumpster per 500 square feet with conventional stick framing. 

⇒Project Highlight, Colorado Arts School Completed in 22 Weeks:  Speed meets efficiency at Parker Performing Arts School!  Chosen for its rapid construction capabilities, Premier SIPS was pivotal in meeting the tight deadline.  Delivered during June and completed by September, just in time for the upcoming new school year.

Real-World Validation: The RS Means Study

A study by RS Means, an industry standard for labor research, compared two identical 2,500-square-foot homes—one built with conventional framing and the other with SIPs. The results were striking: the SIP-built home reduced installation time by 130 labor hours, a 55% faster rate than traditional methods. This substantial time savings underscores the efficiency and effectiveness of SIP construction.

In your next construction project, speed and quality do not have to be mutually exclusive. SIPs offer a unique solution that accelerates the building process while maintaining, and often enhancing, the quality of construction. The ripple effect of faster construction with SIPs benefits every phase of the project lifecycle, making it a smart choice for developers and contractors.

Learn more from our extensive library of Builder Resources, Design Resources, and Premier SIPs articlesReach out to a local Premier SIPs Rep to talk more about your construction projects and how SIPs can help