Building Better: A Series Focused on the Universal Challenges of Construction
The drawings are approved, the bids are in, and the construction schedule looks realistic. Then the first change order arrives. A window opening needs to move, a duct conflicts with a structural beam, or a detail that was never fully resolved during design becomes a problem in the field. What seemed like a minor adjustment now affects the budget, the schedule, and potentially several trades.
Change orders are a normal part of construction, but not all of them are unavoidable. While unexpected site conditions and owner-requested changes can happen on any project, many costly revisions can be traced back to decisions that weren't finalized, details that weren't coordinated, or information that didn't reach the right people before construction began.
For architects, contractors, and project managers, the opportunity to prevent those changes starts long before anyone arrives on site. Here's where change orders commonly originate, why their timing matters, and how better preconstruction planning can keep avoidable costs and delays out of the project.
The most effective way to prevent construction change orders is to resolve critical design and coordination issues before work begins. Five common sources of avoidable changes are incomplete construction documents, late design revisions, uncoordinated mechanical, electrical, and plumbing (MEP) systems, changes to window and door openings, and communication gaps.
Architects and contractors can reduce these risks through early constructability reviews, coordinated drawings, clearly assigned responsibilities, documented approvals, and a defined decision deadline before fabrication. Structural Insulated Panels (SIPs) build this into the process: panel dimensions, openings, connections, and penetrations are reviewed and approved before manufacturing, so envelope conflicts are resolved on paper instead of in the field.
Not every change order is avoidable. Some come from conditions no one could reasonably predict. Many others trace back to issues that could have been caught during design development, construction documentation, or preconstruction coordination.
Changes that may be unavoidable include:
Potentially avoidable changes include:
The distinction matters because preventing change orders doesn't mean eliminating every project adjustment. It means identifying which risks you can address before they affect construction.
The financial consequences of poor coordination are well documented. In its 2018 Construction Disconnected research, PlanGrid and FMI found that miscommunication and poor project information accounted for 48% of rework on U.S. construction jobsites.
That finding measures rework rather than change orders specifically, but it illustrates how expensive unresolved information can become once work is underway.
The takeaway: A substantial opportunity to reduce construction costs exists before construction starts, when you can address design decisions and coordination issues without disrupting completed work.
Understanding where change orders originate is the first step toward preventing them. While every project has different challenges, five recurring issues deserve particular attention during design and preconstruction.
How to prevent it: Conduct a coordinated document and constructability review before bidding. Architects, engineers, and contractors should identify unresolved details, confirm critical dimensions, and clarify scope boundaries before pricing is finalized. For architects, this means reviewing not only whether the design meets its intended performance requirements, but also whether the documents provide enough information for accurate pricing and construction.
Design changes become more disruptive as a project progresses. A change that takes minutes on a drawing during schematic design can ripple through multiple trades once framing, procurement, or fabrication is underway. Late revisions may result from owner decisions, value engineering, product substitutions, permit comments, or details that were not fully coordinated during design. The challenge is rarely the revision alone. It's the work that has already been completed based on the previous design.
How to prevent it: Establish clear design milestones and decision deadlines for elements that affect structure, building geometry, material procurement, and construction sequencing. Architects should also communicate the downstream implications of proposed changes so owners can make informed decisions before those changes become expensive.
Mechanical, electrical, and plumbing conflicts are a common source of construction rework. A duct may intersect a structural beam, a plumbing stack may conflict with a shear wall, or an electrical panel may be located where required clearances cannot be maintained. These conflicts often become visible only when multiple trades begin installing their systems in the same space. According to research from Dodge Construction Network, construction coordination issues contribute to an average 9% budget increase among affected contractors, demonstrating how costly these problems can become.
How to prevent it: Coordinate MEP layouts with architectural and structural drawings before construction or fabrication. This includes confirming equipment locations, duct routes, plumbing stacks, electrical pathways, structural penetrations, and required clearances. On projects using prefabricated assemblies, this review is especially important because openings and penetrations may need to be incorporated into the manufactured components.
How to prevent it: Finalize window and door selections early enough to coordinate actual manufacturer dimensions, rough openings, structural requirements, and installation details. Architects should verify that the opening schedule, architectural elevations, structural drawings, and shop drawings reflect the same approved information.
Even well-developed drawings cannot prevent problems when project teams are working from different information. An architect may issue a revised detail, but the field crew continues using an earlier drawing. A subcontractor receives an answer to a request for information (RFI), but the decision never reaches another affected trade. The result may be unnecessary rework, conflicting installations, or disputes over who authorized the change. The same 2018 PlanGrid and FMI survey attributed 26% of construction rework to poor communication between project team members.
How to prevent it: Maintain a single controlled set of current documents, establish a formal process for distributing revisions, and record decisions that affect scope, cost, or schedule. Every significant change should have a documented approval and a clear record of which drawings, specifications, and trades are affected.
| Construction Change Order Causes and Prevention Strategies | ||
|---|---|---|
| Common Cause | Potential Impact | Prevention Strategy |
| Incomplete documents | Bid exclusions, additional scope, and pricing disputes | Complete document and constructability reviews before bid |
| Late design revisions | Rework, material changes, and schedule delays | Establish design milestones and decision deadlines |
| MEP coordination conflicts | Field modifications and trade disruptions | Coordinate routes, clearances, and penetrations early |
| Changed openings | Structural and envelope modifications | Confirm products and rough openings before fabrication |
| Communication gaps | Rework based on outdated or conflicting information | Maintain controlled drawings, approvals, and change logs |
Related Reading
→ Why Trade Coordination Breaks Down, and How to Reduce the Risk→ The Hidden Cost of Field Modifications in Construction→ Boosting Construction Efficiency, Reducing Budget Overruns with SIPsOne of the most important principles in construction planning is that the cost of making a change generally increases as a project moves from design into construction.
This relationship is commonly illustrated by the MacLeamy Curve, a concept associated with architect Patrick MacLeamy that shows how a design team's ability to influence project costs is greatest early in the process, while the cost of implementing changes increases over time.
Consider something as simple as relocating a window.
The window hasn't necessarily become more complicated. What has changed is how many other decisions and activities now depend on its location.
For architects and project managers, this is why early design coordination has such a direct relationship to construction cost control.
The goal isn't to prevent necessary design changes. It's to make important decisions while the team still has the greatest flexibility to evaluate alternatives without disrupting construction.
Preventing avoidable change orders requires more than completing drawings. It takes a coordinated process that identifies unresolved decisions, establishes accountability, and ensures the construction team is working from approved information.
Three practices can make a meaningful difference.
Every project should establish milestones for decisions that affect construction sequencing, procurement, and manufactured components.
For a building envelope, those decisions typically include:
These decisions should be reviewed with the appropriate design professionals and construction partners before materials are released for fabrication.
A decision freeze does not mean changes become impossible. It establishes the point after which proposed revisions require a formal review of cost, schedule, and coordination impacts.
Construction teams should agree on how changes will be requested, evaluated, approved, and communicated before the first change occurs.
A useful process answers several questions:
Every proposed change should be documented, with its potential cost and schedule implications reviewed before affected work proceeds, except where contract provisions or urgent safety conditions require otherwise.
This creates a consistent record and reduces the likelihood that informal decisions turn into disputed costs.
Construction coordination becomes more difficult when everyone assumes someone else is handling an unresolved issue.
A practical approach is to maintain a decision log that identifies the issue, responsible party, required action, and deadline.
For example, if an HVAC duct conflicts with a structural member, the log should identify who is responsible for evaluating the routing options, who must approve the solution, and when the decision must be finalized to avoid delaying fabrication or installation.
The objective is simple: every important question should have a clear path to resolution.
Related Reading
→ Power of Preconstruction: How Smart Planning Fuels Better Builds → Designing for Consistency in an Inconsistent Labor EnvironmentAvoidable changes slip through when no one owns the decision. Here's who typically owns what before construction starts.
| Who Owns What Before Construction | |
|---|---|
| Project Stakeholder | Key Responsibilities |
| Owner / Developer | Approve program requirements, major selections, budget decisions, and design milestones |
| Architect | Coordinate architectural documents, openings, building envelope requirements, and design revisions |
| Structural Engineer | Confirm structural loads, connections, beams, headers, and other structural requirements |
| MEP Designers / Trades | Coordinate system layouts, equipment locations, penetrations, and required clearances |
| General Contractor | Lead constructability reviews, manage sequencing, coordinate trades, and maintain current documents |
| Premier Project Manager | Prepare panel shop drawings and manufacturer-specific engineering within the agreed scope for review before fabrication |
Actual responsibilities depend on the project delivery method and contractual agreements. The important point is that each decision has an identified party responsible for moving it toward approval.
Structural Insulated Panels (SIPs) show how prefabrication can build better coordination into a project. With conventional framing, many dimensions and details can drift into the field and get resolved as work progresses. SIP construction requires the building envelope to be coordinated before panels are manufactured, which means conflicts get caught while they’re still changes on a drawing.
SIP window and door openings are cut during manufacturing to the approved shop drawings, so opening sizes and locations have to be confirmed before fabrication. That earlier decision is the advantage: openings are set by the drawings and the factory, not by field layout and cutting, and the opening the architect drew is the opening that arrives on site.
A SIP combines structure, sheathing, insulation, and air barrier into one panel. With conventional framing, those are separate materials, separate crews, and separate inspections, and every handoff between them is a place where information can get lost. Fewer installation steps mean simpler sequencing and fewer coordination gaps, as long as joints, connections, and transitions are detailed and installed correctly.
SIPs are manufactured to approved dimensions in a controlled environment, so panels arrive consistent and square, without the small measuring and cutting variations that stack up across walls and rooflines in stick framing. Premier SIPS are CNC-cut to 99% accuracy, a level of precision you won't get from on-site measuring and cutting, where human error adds up. Accurate drawings and a true foundation still matter, but the envelope no longer depends on how well the field crew measured each cut.
| Stick Framing vs. SIPs: When Are Key Decisions Made? | ||
|---|---|---|
| Coordination Factor | Conventional Stick Framing | SIP Construction |
| Building envelope layout | Established in drawings with some field adjustment possible | Finalized through approved panel shop drawings before fabrication |
| Window and door openings | Typically framed on site | Typically factory-cut to approved dimensions |
| Electrical pathways | Commonly routed during rough-in | Planned chases can be incorporated during manufacturing |
| Envelope installation | Multiple materials and installation steps | Integrated panels combine several envelope functions |
| Dimensional accuracy | Depends on field measuring and cutting; tolerances can stack | CNC-cut at the factory to approved dimensions, 99% accurate |
| Conflict resolution | Issues may be addressed during framing and rough-in | Many panel-related issues must be resolved before manufacturing |
Related Reading
→ Why the Shop Drawing Is the Most Important Document on a SIP Project → Why the Best Building Envelopes Are Designed as Systems → Weather Delays in Construction and How to Shrink the Exposure WindowPlanning a SIP Project?
Send us your plans and we'll flag the envelope decisions to lock in before anything goes to fabrication. SEND US YOUR PLANS →
Yes, particularly after fabrication begins.
A conventional framed wall may allow a contractor to adjust an opening or modify framing in the field, subject to structural and code requirements. A manufactured SIP panel has less flexibility because its dimensions, openings, and structural configuration have already been established.
That makes the timing of design decisions especially important.
This is why early manufacturer involvement is valuable.
For Premier SIPS projects, typical lead times are approximately 10 to 12 weeks from order to delivery, including roughly 3 to 5 weeks for shop drawings and engineering after deposit, followed by approximately 6 weeks for manufacturing and delivery after drawing approval.
Confirm timelines for each project and build them into the schedule. Coordinated with site and foundation work, fabrication runs in parallel, so the earlier decision deadline usually gives time back rather than costing it.
Not every construction challenge can be prevented through planning. However, selecting the right building system early and coordinating its installation can help project teams manage cost and schedule requirements.
The following Premier SIPS projects illustrate two different benefits: making an early system decision that improves project delivery and using prefabrication to help recover time when unexpected challenges arise.
Education | Las Vegas, Nevada
Jacob E. Manch Elementary School
Owner: Clark County School District | Architect: SSA Architecture | Contractor: Martin Harris Construction
| 68,000 SF Single-Story School | 45 Days Framing vs. 118 to 220 | $950K+ Electrical Bid Savings | $20M Approved Budget |
Clark County School District needed to replace an elementary school within a $20 million budget and an aggressive construction schedule. During preliminary design, SSA Architecture determined that the district's conventional concrete masonry and tilt-up wall systems would not meet the project's budget requirements. The team recommended Premier SIPS for the exterior walls and roof.
Making that decision early allowed the design and construction teams to plan around the system's installation requirements. Framing was completed in 45 days, compared with an estimated 118 to 220 days for conventional approaches, and the electrical contractor's bid dropped by more than $950,000.
The takeaway for change order prevention: the system decision was made in preliminary design, so every trade planned around it from the start.
View Project Portfolio →Multifamily / Senior Housing | Phoenix, Arizona
Lofts at McKinley
Architect: Gorman & Co. | Contractor: Tofel Dent Construction
| 60 Units | 3 Stories | 26 Historic Stipulations | 1st Permitted Under New Urban Form Code |
Located in Phoenix's Roosevelt Historic District, the project replaced a vacant office building with housing for seniors and residents with disabilities. Before construction, the team faced asbestos abatement, 26 historic preservation stipulations, and zoning changes that required design revisions, challenges that could not all be resolved through ordinary design coordination.
With the construction deadline becoming increasingly important, the project team selected Premier SIPS walls in place of conventional wood framing. The large, precut panels helped accelerate building enclosure and allowed the team to recover time in the construction schedule.
When upstream changes hit the schedule, a prefabricated envelope gave the team a way to make up time instead of losing more.
View Project Profile →Related Reading
→ Parallel Construction with SIPs: Pro Forma ImpactOne of the most practical ways to reduce avoidable change orders is to review critical decisions before releasing manufactured components or beginning work that depends on them.
This checklist can be used during preconstruction meetings, design coordination reviews, or the SIP shop drawing approval process.
New to SIPs? Start With Our Planning Guide
See how pre-fabrication approval works, step by step, plus a printable pre-fabrication checklist for your next coordination meeting. When your project moves forward, your Premier project manager will provide a project-specific checklist. DOWNLOAD THE PLANNING GUIDE (PDF) → | SEND US YOUR PLANS →
Pre-Fabrication Checklist
✓ Construction documents are sufficiently complete for the planned work and procurement.
✓ Architectural, structural, and MEP drawings have been reviewed for conflicts.
✓ A constructability review has been completed with the contractor.
✓ Unresolved details, allowances, and exclusions have been identified and assigned for resolution.
✓ Wall heights, roof pitch, and roof geometry are confirmed.
✓ Structural loads, beams, headers, and connections have been reviewed by the responsible engineer.
✓ Supporting structure and foundation dimensions are coordinated with the building system.
✓ Major design decisions have documented approval deadlines.
✓ Window and door products are selected.
✓ Rough openings match the approved product requirements.
✓ Opening schedules agree with architectural elevations and shop drawings.
✓ Structural and envelope details around openings are coordinated.
✓ Major duct, plumbing, and electrical routes are established.
✓ Structural conflicts and penetrations have been reviewed.
✓ Electrical chase locations are coordinated with panel layouts where applicable.
✓ HVAC sizing reflects the specified building envelope performance.
✓ Required equipment clearances and service access are confirmed.
✓ Each unresolved decision has a responsible party and deadline.
✓ Change request and approval procedures are documented.
✓ Shop drawings have been reviewed by the appropriate project team members.
✓ The current approved drawing set is accessible to affected trades.
✓ Superseded drawings and revisions are clearly identified.
✓ Fabrication and delivery lead times are included in the project schedule.
✓ Long-lead materials and products have been identified.
✓ Required approvals are scheduled before procurement deadlines.
✓ The SIP manufacturer has been consulted early enough to address panel-specific design requirements.
A checklist cannot prevent unforeseen conditions or eliminate every project revision. What it can do is expose unresolved issues before they affect manufacturing, procurement, or completed construction.
For architects and contractors, that is often the difference between a manageable design revision and an expensive field change.
Want a Second Set of Eyes on the Checklist?
Download the one-page checklist for your next coordination meeting, or send us your plans and a Premier SIPS advisor will walk through it with you before fabrication. DOWNLOAD THE PRE-FAB CHECKLIST (PDF) → | SEND US YOUR PLANS →
Common causes include incomplete construction documents, design errors or omissions, owner-requested changes, unforeseen site conditions, coordination conflicts, and late material or product substitutions. Many potentially avoidable changes originate during design and preconstruction, when important details remain unresolved or information is not adequately coordinated.
Architects can reduce avoidable change orders by developing coordinated construction documents, identifying unresolved design details, reviewing structural and MEP conflicts, confirming material selections and openings, and participating in constructability reviews. Clear documentation and timely responses to design questions also help prevent field rework.
Decisions that affect structural geometry, openings, building envelope assemblies, MEP penetrations, and manufactured components should be finalized before the affected materials are fabricated or installed. The exact deadline depends on procurement requirements, construction sequencing, and the project's delivery method.
SIPs reduce avoidable change orders by requiring panel dimensions, openings, connections, and penetrations to be reviewed and approved before manufacturing, so conflicts are resolved on paper instead of in the field. Owner revisions and unforeseen site conditions still happen on any project, but the envelope itself is coordinated before it's built.
Yes, some modifications may be possible, but they must be evaluated according to the manufacturer's requirements and the project's structural design. Depending on the modification, additional engineering, approved repair details, or replacement panels may be necessary. Resolving changes before fabrication is generally the more efficient approach.
Construction will always involve decisions, adjustments, and unexpected conditions. The goal isn't to eliminate change orders entirely, but to prevent the ones that result from incomplete information, unresolved details, and coordination problems that could have been addressed earlier.
For architects, that means developing coordinated documents and understanding how design decisions affect construction. For contractors, it means identifying conflicts before they interrupt work. And for owners, it means making informed decisions while there is still flexibility to evaluate cost and schedule impacts.
That is where SIPs earn their place. When the envelope is engineered, drawn, and approved before a single panel is cut, envelope conflicts get resolved at the drawing table instead of on the jobsite, where they cost the most.
Planning a Project with SIPs?
Bring Premier SIPS into the conversation during design. Our team can help coordinate panel layouts, openings, fabrication requirements, and project lead times so your team has the information it needs before construction begins.
Talk to a Premier SIPS Advisor →