Weather Delays in Construction and How to Shrink the Exposure Window
Every week a framed structure sits exposed to weather is real financial risk. See what that risk actually costs and how to..
7 guys + machine = SIP installation in 13 days
9,000 sq. ft. Benihana restaurant in L.A. County (Downey, CA) was installed in 11 days with 7 labors (13 days to dry in). Our local engineer was crucial reducing the amount of steel and other structural elements during redesign and pushing through L.A.’s rigid code/permitting/inspection process.
Building systems with acceleration advantages is key these days for builders and developers. With weather constrictions, labor shortages and positive building economy… construction teams are wanting to get projects up easy and quick. Erection of SIP panels is estimated to be as much as 3 times faster than traditional framing with no special training for framing installation needed, and provides multiple building needs all in one step. More benefits include:
SIPS Installation: Green Wall-US
Structural Engineer: Wright Engineers
Every week a framed structure sits exposed to weather is real financial risk. See what that risk actually costs and how to..
SIPs vs. stick framing, compared honestly across strength, energy, air tightness, labor, and cost, plus where stick framing..
A clear, side-by-side comparison of EPS, PUR, XPS, polyiso, fiberglass, cellulose, and mineral wool, ranked on the..
Premier SIPS deliver a high-performance building envelope that outperforms traditional framing in efficiency, strength, and long-term durability. If you're evaluating SIPs, planning an upcoming project, or ready for pricing, now is the time to talk with our team about the right next step.