Tech Talk: Premier SIPS Deliver Built-in Continuous Insulation (Ci) Required by Energy Codes
While adding Ci to wood-framed construction is an effective way to improve energy efficiency, SIPs naturally meet and..
Builders and general contractors often struggle with learning how to price Structural Insulated Panels (SIPs) in their projects. Unlike traditional stick framing, SIPs offer a high-performance building envelope, but the key to accurate pricing lies in understanding how to qualify a project and compare bids effectively.
This guide walks you through five essential steps to properly evaluate SIPs pricing, ensuring you get a fair and complete cost estimate for your project.
Pricing SIPs isn’t just about getting a number—it’s about ensuring that number includes everything you need for an accurate cost comparison.
Lumber packages may exclude high-cost items like 2x12s and 2x6s or headers and window bucks, which can create an artificially lower bid but are critical to complete the envelope. Ensure that your SIPs or Lumber quote covers everything needed for a full building envelope construction.
SIPs demand less labor and install faster than traditional framing. We have many case studies documenting the actual time it takes to install SIPs in the field, and this is generally 55% faster than site-framed lumber and batt assembled buildings. While the time may not vary significantly, labor rates will vary from region to region. To accurately estimate labor costs for bids, follow these steps:
Labor Installation Time Calculation
Project Details | SIP Actual Install Hours |
Two Story, 42'x28', Roof & Walls 3-bedroom cape style home with 3 dormers on a 12/12 pitch roof |
|
Single Story, 3,900 SF Duplex, Walls Only |
|
Single Story, 3,600 SF Home, Walls Only |
|
Two Story, 28'x22' Home, Walls & Roof |
WALLS:
ROOF:
|
Single Story, 2,500 Roof and Walls |
3-man crew, 4 days |
Factors impacting labor efficiency can include roof complexity—steeper or more intricate slopes can reduce installation speed—and the use of equipment, where cranes or panel lifts significantly improve productivity. For precise labor cost estimates, always cross-check productivity rates with RS Means or local labor databases to ensure accurate bidding and to keep framing contractors aligned with industry standards.
One of the biggest mistakes builders make is pricing SIPs using total building square footage rather than the actual wall, roof, and floor panel areas.
This method helps you directly compare SIPs vs. stick framing without relying on misleading total square footage estimates.
Stick framing often leads to inspection delays and costly rework due to:
With SIPs, inspections are simpler and faster:
Builders who have switched to SIPs report fewer inspection delays and a smoother approval process, further improving efficiency and labor cost savings. Learn more about the top 10 challenges builders tackle with SIPs.
SIPs are not the cheapest upfront option, but they are the best value. Instead of comparing only initial costs, consider:
Builders should consider the big picture—SIPs provide higher-quality buildings, reduce total construction time, and offer long-term savings that outweigh the initial price comparison.
>> Beyond Initial Costs: Why Building With SIPs Leads to Long-Term Savings
When pricing SIPs for your construction project, keep these key steps in mind:
Want an accurate SIPs quote for your next project? Contact your Premier SIPS Representative today to learn how SIPs can streamline your build and maximize your bottom line.
While adding Ci to wood-framed construction is an effective way to improve energy efficiency, SIPs naturally meet and..
Learn why not all offsite construction is the same and how SIPs offer superior strength, efficiency, and sustainability for..
Rebuild smarter after wildfires with fire-resistant SIPs. Discover resilient building strategies designed to withstand..
As the oldest SIP manufacturer, Premier SIPS offers a superior building envelope framing system for commercial and residential structures. Contact an expert in your region to discuss your next project or to explore the benefits and cost savings when designing and building with SIPs.