SQFT Studios
DADU | Seattle Washington | SIPs DADU
Washington
Project Type Residential | ADU & DADU
Year Completed 2020
Project Size 380 sq ft
SIPS Used 4" EPS Walls / 8" EPS Roof
Sustainable Features Premier SIPS, Low VOC - cabinetry, paint (interior/exterior), cork flooring
Awards 2021 BEA Classic Homes Under 900 S/F Classic Runner-Up
Architect MyKabin
Contractor MyKabin
Project Overview
- 4 Star Built Green Certification
HVAC System:
- HRV - PANASONIC FV-04VE1 SPOT Energy Recovery Ventilator (ERV) provides fresh ventilated air.
- Whole House fan is located in the kitchen. PANASONIC FV-0810VSS1 80-100 CFM CONTINUOUS OPERATION
- Bath Fan - PANASONIC FV-0510VSL1 50-80-100 CFM. Cadet heater.
Energy-Saving Materials:
- WIndows U=0.28
Client Comment:
“The warmth, the customer service, the flexibility of the product,” Shanna said. “It’s a great product. There’s a no-nonsense angle, which is great. Pragmatic. You get a good price and a lot of reliability.”
Start The Project Conversation
High-performance buildings start with better systems.
Premier SIPS deliver a building envelope that outperforms traditional framing in efficiency, strength, and long-term durability. If your project demands higher performance and greater predictability, let’s talk.

