The Only WUI Compliant Fire Resistant SIP Option!

LA County Restaurant

Time lapse for a 7000 sf restaurant in L.A. county (town of Downey, CA). 7 guys + machine in 11 days of actual SIP install (13 days to dry in). Our local engineer was crucial reducing the amount of steel and other structural elements during redesign and pushing through L.A.’s rigid code/permitting/inspection process.

Transcript

Background music plays. No spoken dialogue.

 

Find Your Local Rep

As the oldest SIP manufacturer, Premier SIPS offers a superior building envelope framing system for commercial and residential structures. Contact an expert in your region to discuss your next project or to explore the benefits and cost savings when designing and building with SIPs.

Contact Us