Rocky Mountain Institute, CO

Pearl Izumi Corporate Headquarters, CO
Colorado
Project Type Commercial | Office
Year Completed 2012
Project Size 56000 sq ft
SIPS Used 10" Roof & 10" Walls
Environmental Certifications Net Zero/Zero Energy Ready
Awards 2014 SIPA Building Excellence Award Recipient for Best Commercial and Best Overall Project,
Architect ZGF Architects & Arch11
Project Overview
The industrial-styled building uses natural materials chosen to integrate the building into the natural landscape and the facility’s Rocky Mountain views. The 56,000 sq. ft. building achieved dramatic energy savings by using 10-inch-thick SIP wall panels and 10-inch-thick SIP roof panels for an airtight building envelope.
The open plan for construction offers design efficiency and enables Pearl Izumi to take advantage of day lighting, solar orientation, and natural ventilation strategies that help create a comfortable work environment for this corporate workspace. Exposed SIPs lent perfectly to the building’s industrial design that flows throughout the entire facility.
Premier SIPS construction reduced framing time and helped the facility to easily meet the 2012 Colorado energy requirements. SIPs construction also enabled the design of the building and the workspaces to be open, collaborative, and grouped by division. This project won the 2014 SIPA Building Excellence Award for Best Commercial and Best Overall Project.
Notably, the Design Firm ZGF Architects earned Architect Magazine's #1 position in the 2016 Top 50 Firm rankings, which are based on scores from three categories: business, design, and sustainability.
Find Your Local Rep
As the oldest manufacturer in the SIPs industry, Premier’s SIP system is the proven prefabricated building envelope framing system for your next commercial or residential structure. Faster, stronger, and greener than outdated lumber framing methods, SIPs are the future of framing. Join the other thousands of structures built with SIPs, and contact the expert in your local region to get started.