Apex Track Side Car Condo, AZ

Saint Paul Episcopal Church
Washington
Project Type Commercial | Community Use
Project Size 5328 sq ft
SIPS Used Roof Only
Project Overview
Built in 1958, the Church had an existing roof that was built using rough timber construction in an unorthodox accordion style which caused issues with the roof’s shear strength. Over the years, that lack of shear allowed for extensive movement resulting in roof leaks. They had a problem and needed a solution!
- PROBLEM: Roof lacked structural integrity, insulation and had resulting leaking issues
- SOLUTION: Remove the existing roofing, add 5,328 sq ft of 8″ Premier SIPS roof panels and new metal roof
- OUTCOME: Significantly increased the structural characteristics while adding substantial insulation value to the building, while creating strong, stable, leak-proof roof for decades to come
Related Portfolio
Find Your Local Rep
As the oldest SIP manufacturer, Premier SIPS offers a superior building envelope framing system for commercial and residential structures. Contact an expert in your region to discuss your next project or to explore the benefits and cost savings when designing and building with SIPs.