Alakanuk School
Tribal | Northern California | SIPs Youth Treatment Center
California
Project Type Commercial | Education/Schools
Year Completed 2020
Project Size 35304 sq ft
SIPS Used 8" EPS Walls & 12" EPS Roof
Sustainable Features LEED Platinum, HERS - 19! Net-Zero + 4250 HWh surplus (powers elect car for 10K miles), Premier SIPS, Solid wood cabinets with low VOC finish, All low-VOC paints, adhesives and sealants, Zehnder HRV, No gas burning appliances in house/ 100% storm water infiltrated on-site. 58% of walkways, driveways and patios are permeable. 80% of the 4.93 acres is undisturbed field grass and native prairie. Less than 3% of the lot is turf grass. Landscaping is primarily fruit and vegetables and native plants. Western Red Cedar trees will provide a windbreak along the northern property line. 20% water use reduction using all WaterSense Certified fixtures. 21% of the lot granted perpetuity to Whatcom County as conservation easement.
Environmental Certifications LEED/USGBC
Awards 2021 BEA Affordable Housing High Performance Winner
Architect Johnson Smitthipong & Rosamund
Contractor Shell Building Systems
Project Overview
Utilizing 8" exterior panels and 12" roof panels, created extreme energy efficiency of over 65%, giving the project Zero-Energy compliance and Energy Start Certification plus Leed Platinum. This was a must as the project is located in the central Valley of CA, with very hot temperatures in the summer months and cold in the winter months.
- Two buildings have curved walls and roofs, to follow the radius of the roundhouse located in the courtyard.
- All curved radius cuts were figured on the shop drawings for the SIPs and cut during manufacturing.
- The roundhouse has a circumference of over 100' with a 14' radius.
- The roundhouse wall panels are segmented to allow for the curved radius of the building.
- 5-Energy Star
- Net Zero Energy Certified
- Dept. of Energy Zero-Ready Certified
- All Energy Star Appliances
- Indoor airPLUS Certified
- Floor Score Certified
- LEED V4 for BD+C Platinum Certification
- UL Certified
HERS Index: -19
Blower Door Test: .047 ACH 50
Energy Use:
- Roof Top Units and VRVs
- 4250 HWh surplus (net-positive) power (equivalent to 10,000 miles in an electric car at 2.6 mo9/kWh)
HVAC:
- All HVAC has ASHRAE 135 Compliance
- Meets the LEED V4 BD+C Platinum Certification and Zero Energy design.
Other Energy-Saving Materials Used: All materials had to meet Zero-Energy Design and compliance with LEEDs.
Solar Panels: 12.43 kW roof PV Array
Additional Comments:
"The whole-house battery wiring and Alexa-controlled blinds, lighting, and electronics ensure the home is future-ready for everything Mother Nature brings while leaving only a light zero-emissions footprint. "
Related Portfolio
Start The Project Conversation
High-performance buildings start with better systems.
Premier SIPS deliver a building envelope that outperforms traditional framing in efficiency, strength, and long-term durability. If your project demands higher performance and greater predictability, let’s talk.

